Cool Room Kits Adelaide | DIY & Commercial Kits | Cool-Time
Pre-engineered kits, delivered across SA

Complete Cool Room Kits in Adelaide.

Pre-engineered cool room kits for DIY builders and commercial operators — complete with panels, refrigeration, doors, and controls, ready to assemble or fully installed by Cool-Time.

Everything included
DIY or installed
2–3 week lead times
REFRIGERATION PANELS DOOR +2°C CONTROLLER LIGHTING COOL-TIME KIT FRAGILE ✓ COMPLETE THIS WAY ↑
Includes
All Components
Delivery
Adelaide-wide
8+
Years In Business
2-3
Week Lead Times
100%
Complete Kits
SA
Locally Owned
About The Kits

Everything you need, in one delivery.

Cool-Time supplies complete cool room kits across Adelaide and South Australia — pre-engineered and pre-cut, ready for self-assembly or full professional installation. Whether you're a hands-on DIY builder fitting out a home wine cellar or a business owner adding cold storage to your back-of-house, our kits include every component you need.

Each kit is engineered to suit Australian conditions and Australian standards, using the same commercial-grade panels, refrigeration, and hardware we install on major commercial projects — just packaged ready for delivery direct to your site.

Kit Range

DIY and Commercial Cool Room Kits

Two clearly defined kit ranges — one for hands-on home and small-business builders, one for commercial operators who want a commercial-grade build delivered fast.

DIY Cool Room Kits

For Home & Hobby Builders

Designed for hands-on customers building home wine cellars, hobby butcher rooms, hunting cold-stores, and small commercial cool rooms. Every DIY kit ships with cam-lock panel systems and step-by-step instructions that make assembly straightforward with basic tools.

  • Standard sizes from 1.5m × 1.5m to 3m × 4m
  • Cam-lock panels for tool-free assembly
  • Self-contained refrigeration unit (plug & play)
  • Comprehensive installation manual
  • Phone & email support during build
  • Australian-standard compliant components
Get DIY Kit Pricing

Commercial Cool Room Kits

For Business Operations

Engineered for hospitality, retail, food production, and commercial back-of-house environments. Larger footprints, heavier-duty refrigeration, and an optional Cool-Time installation service get you operational fast — without the wait of a full custom-build process.

  • Sizes from 3m × 3m up to 6m × 8m+
  • Heavy-duty split refrigeration systems
  • Commercial-grade doors & hardware
  • Optional full Cool-Time installation
  • HACCP-compliant finishes available
  • Service-contract eligibility on completion
Get Commercial Pricing
Contents

What's Included in Every Kit

Cool-Time kits are designed to be genuinely complete — everything required for a functional, compliant cool room arrives in the one delivery.

Insulated Wall Panels

Pre-cut and ready to assemble with cam-lock connections.

Ceiling Panels

Matching insulated ceiling panels with integrated suspension.

Floor Panels

Heavy-duty insulated flooring (or floor channel option).

Refrigeration Unit

Self-contained or split system sized to room volume.

Cool Room Door

Hinged or sliding door with frame, seals & hardware.

Digital Controller

Pre-configured temperature controller with alarms.

Internal LED Lighting

Vapor-rated cool room LED lighting with switch.

Trims & Hardware

All cam-locks, corner trims, fixings, and seals.

Installation Manual

Step-by-step instructions with diagrams & specs.

★ Optional Install Service

Want Cool-Time to install your kit?

Order any kit with our optional installation service and have a certified team assemble, seal, and commission the entire room on-site.

DIY Build Guide

Installation Guide Overview

Most DIY kits go together in 1–2 days with two people. Here's the high-level sequence — full step-by-step diagrams ship with every kit.

01

Site Preparation

Level the floor, confirm clearances, and pre-run power to the proposed refrigeration location.

02

Floor & Wall Assembly

Lay floor panels (or channel), then build wall panels using cam-lock connections per the manual.

03

Ceiling & Door Fit

Install ceiling panels, fit the door frame, hang the door, and check seals all around.

04

Refrigeration & Commissioning

Mount the unit, connect drain & controller, then have a licensed electrician connect power and commission.

All electrical connections must be completed by a licensed electrician. Cool-Time can arrange this as part of your order if required.

How To Order

Order Information

Ordering a Cool-Time kit is straightforward. Here's what to expect from initial enquiry through to delivery and commissioning.

  1. Initial enquiryCall or email us with your room dimensions, target temperature, and intended use.
  2. Quote & specificationWe confirm the kit configuration, components, optional upgrades, and total price.
  3. Order & depositConfirm your order with a deposit. Standard kits build in 2–3 weeks, custom in 4–6.
  4. DeliveryKit delivered to your Adelaide site on the agreed date, palletised and labelled.
  5. Build & commissionSelf-assemble using the manual, or book our team to install and commission for you.

Order Your Kit

Our team responds to kit enquiries within 24 hours. Have your room dimensions, target temperature, and site location ready to speed up the quote.

Lead Time
2–6 weeks
Delivery
Adelaide & SA
Payment
Deposit + balance
Install
DIY or Cool-Time
Request a Kit Quote →
FAQs

Frequently Asked Questions

Common questions about ordering, installing, and operating Cool-Time cool room kits.

What is included in a Cool-Time cool room kit?
Every kit includes insulated wall, ceiling, and floor panels, a refrigeration unit sized to the room, a cool room door with seals and hardware, a digital temperature controller, internal LED lighting, all fixings and trims, and step-by-step installation instructions.
Can I install a cool room kit myself?
Yes. Our DIY kits are engineered for self-assembly using cam-lock panel systems and clear instructions. Electrical connection of the refrigeration unit must be completed by a licensed electrician. We also offer full or partial install support for any kit.
How long does a cool room kit take to install?
Most standard DIY kits can be assembled by two people in 1–2 days. Larger commercial kits typically take 2–4 days. Refrigeration commissioning and electrical connection adds an additional half-day.
What are the lead times on cool room kits?
Standard-size kits are typically available within 2–3 weeks. Custom-sized or specially configured kits generally require 4–6 weeks depending on panel and door specifications.
Do you deliver kits outside of Adelaide?
Yes. We regularly deliver cool room kits across South Australia and can arrange freight to regional locations on request. Delivery costs depend on distance and access.
Complete. Delivered. Built To Last.

Ready to Order Your Cool Room Kit?

Talk to Cool-Time about a DIY or commercial cool room kit, delivered across Adelaide and South Australia.